Saturday, June 28, 2014

Power Draw Bar Install Tormach P/N 31706 for PCNC 1100 Part 5 - Air lines

Power Draw Bar Cylinder Assembly
Added 2 Each Air Filter Silencer Muffler Sintered Bronze 1/4 NPT
Re-Routed the existing air lines, so both air line connections are in the same area
Added the air lines that connect the air cylinder to the air control valve
Red = Extend
Green = Retract 



PARKER 369PTC-4-4 90 Male Elbow, 1/4"  

Blue = Regulated and Lubricated Air
2 Each PARKER 369PTC-4-4 90 Male Elbow, 1/4"
1 Each Weatherhead 1468X4X4 Male Connector, 1/4 x 1/4
1 Each BRS 410-4F4M-B, Piston Spring Check Valve,Brass, 1/4"


 1 Each Weatherhead 1469X4X4 Male 90 Connector, 1/4 x 1/4 





Tuesday, June 24, 2014

Cleaning up the Spindle Motor and Spindle Door Interlock wiring

Original Spindle Motor and Spindle Door Interlock Wiring
Removed the existing Spindle Motor and Spindle Door Interlock Sleeving
Extended Spindle Motor Electrical Wire Fiberglass Insulation Sleeving
Spindle Door Interlock Wiring  protection changed to shrink tubing

Exploring the Spindle Motor and Spindle Door Interlock Wiring



Added Electrical Wire Fiberglass Insulation Sleeving to the Spindle Motor Wiring

Electrical wire fiberglass insulation sleeving entering the control Cabinet

Cleaning up the Z-Axis, X-Axis and Y-Axis Motor Wiring

Electrical Wire Fiberglass Insulation Sleeving
 added to the Z-Axis Motor and Brake Wiring







Original X-Axis and Y-Axis Motor wiring

Removed the existing X-Axis and Y-Axis Electrical Wire Fiberglass Insulation Sleeving
Replaced the X-Axis and Y-Axis Electrical Wire Fiberglass
 Insulation Sleeving with a longer length


Wiring inside the Z-Axis Column Before & After

Column rear access cover removed
Looking up into the column
Spindle Motor and Spindle Door Interlock Wiring
X-Axis Wiring and Y-Axis Wiring
Z-Axis Wiring (The Gray looking wires are for the z-axis brake)

After adding Electrical Wire Fiberglass Insulation Sleeving
This image shows the finished wire routing inside the Z-Axis Column
(Blue cable ties are on the Power Draw Bar Wiring)



Monday, June 16, 2014

Holes for Power Draw Bar Cable Carrier not aligned

This mounting hole for the P/N 31476 - PDB Cable Carrier was drilled at the factory

As you can see, the hole in the mounting bracket
 for the other end of the PDB Cable Carrier are not aligned

So the welder tacked the Bracket in the wrong location. Or the person
 drilling the hole in the spindle guard drilled it in the wrong location




So I Removed the bracket
Aligned the bracket to the PDB Cable Carrier
Clamped and ready for welding
My friend Ken welded the bracket back on the control box. 
Thank you Ken!!




Saturday, June 14, 2014

Power Draw Bar Install Tormach P/N 31706 for PCNC 1100 Part 4 - Clearance

Setting the Clearance between Power Draw Bar M16x30 Bolt
and the Spindle Draw Bar Assembly 
NOTE Adjust the draw bar so the tool holder releases at 90PSI

Unscrew the M16 Bolt until it touches the top of the Draw Bar

Remove the Power Draw Bar Cylinder Assembly
Measure from the top of the M16 bolt head to Cylinder

Seat the M16 Screw against the Cylinder
Measure from the top of the M16 bolt head to Cylinder
Select a shim thickness to give you the required Clearance
Install the Selected Shims
Visually check the Clearance between Power Draw Bar
 M16x30 Bolt and the Spindle Draw Bar Assembly
Check that the power draw bar will still release the tool holder at 90PSI